Trade coordination
Every trade scheduled, dispatched, and accountable to one project manager. No phone tag with subcontractors, no sequencing conflicts.
One PM on every buildWe manage the trades, the timeline, and the budget so you don’t have to. One project manager, weekly updates, fixed-price quotes, and a dated delivery you can plan around.
Why hire a CM
Without a construction manager, you become one. You pick the trades, sequence them, chase quotes, approve materials, and own every delay. Hiring Ace as your CM puts that work back where it belongs: with a builder who has spent a decade on Calgary inner-city sites and knows where the trouble hides.
We come in early, scope honestly, and run the project with the same standard whether the budget is $1.5M or $4M.

What we manage
We don’t sub the management. Every one of these stays inside Ace, with a single name attached.
Every trade scheduled, dispatched, and accountable to one project manager. No phone tag with subcontractors, no sequencing conflicts.
One PM on every buildFixed-price quotes per trade, change orders documented and pre-approved, monthly budget reconciliation. You always know what's left.
Fixed-price contractMaster schedule locked at mobilization. Weekly walkthrough video, photo updates, and a single point of contact for every question.
Weekly walkthroughAll municipal permitting, inspections, utility coordination, occupancy, and warranty registration handled by Ace.
Municipal & warrantyBuilt on a record
A typical Ace build, week by week
Every project has its own pace, but the rhythm is consistent. Here's what a six-month custom build looks like on the management side.
Week 0
Site setup, permits posted, utilities marked, schedule of trades locked in. You receive the master timeline and the single point of contact for the project.
Weeks 1 to 4
Demolition or excavation, foundations poured, underground services run. Daily site checks; weekly walkthrough video update.
Weeks 5 to 10
Framing complete, roof on, windows in, exterior cladding started. The home is dried in. Now is the last clean window for layout changes.
Weeks 11 to 18
Plumbing, electrical, HVAC, low-voltage. City inspections coordinated. You sign off on every rough-in before drywall covers it.
Weeks 19 to 24
Drywall, tile, flooring, millwork, paint. Finish selections you made early in design come to life. Daily quality checks.
Weeks 25 to 28
Appliances, fixtures, deficiency walks, final inspections, occupancy. We hand you the keys with the warranty package and a 30/60/90-day check schedule.
Why buy from Ace
These aren't spec builds chasing volume. Every home in our inventory is the same calibre as our presales: custom-designed for a specific inner-city lot, finished by trades we've worked with for years, and held to the same standard of detail as a build you'd start from scratch.
When you buy an Ace home, you get award-winning craftsmanship from a team that treats every project as their own. Every home is backed by Progressive Home Warranty and our after-possession support, so the relationship doesn't end at the keys.

CM FAQ

Already have plans?
Bring us a set of permitted plans (or plans nearly ready for permit) and we’ll quote the build, manage the trades, and deliver to spec.